NEWS
CATEGORY
Your current location: Home >> News
GNSS RTK for Earthworks Surveys in Australia: From Field Data to Volume Calculations

For earthworks contractors and surveyors in Melbourne and across Australia, useful volume calculations start with a survey that represents the ground accurately. 

GNSS RTK can help collect terrain positions and elevations in suitable conditions. Those measurements can then be processed in compatible survey or civil engineering

 software to model surfaces and calculate volumes.


Whether the task is a pre-construction terrain survey, a stockpile assessment or a progress survey, the workflow matters as much as the equipment.


Start with consistent survey control


Before collecting points, confirm the project coordinate system, height reference, receiver settings and antenna height. Check measurements against verified site control and 

the accuracy required for the task.


When comparing surveys taken on different dates, use consistent references and clearly record the survey extent. An apparent change in ground level should reflect site activity 

rather than a change in survey setup.


Capture the shape of the ground


A terrain model needs more than evenly spaced points. Record changes in slope, the tops and toes of banks, drainage features and the boundaries of the area being assessed. 

Breaklines help the software represent important changes in the terrain rather than smoothing across them.


For a stockpile, capture its footprint and enough surface detail to represent its shape. Adapt point spacing to terrain complexity and the project’s requirements. Where areas cannot be

 measured safely or reliably, document the gaps and arrange an appropriate alternative survey method.


Turn field measurements into a surface model


Import the survey into software that supports the required data formats and surface modelling tools. A triangulated irregular network, or TIN, is one way to represent the measured terrain.


Review the model before calculating volumes. Check for missing features, unusual elevations and triangles that span gaps or extend beyond the intended boundary. A detailed-looking 

model can still misrepresent the ground if the input data or boundaries are incomplete.


Choose the right volume comparison


Earthworks volumes may be calculated by comparing an existing-ground surface with a design surface, or an earlier survey with a later one. Stockpile calculations require an appropriate 

base surface; the choice of base can materially affect the result.


Keep the calculation boundary, units and reference surfaces clear. Surveyed geometric volumes also need to be distinguished from quantities adjusted for material bulking, shrinkage or 

compaction.


Can GNSS RTK calculate earthworks volumes directly?


GNSS RTK provides positioning measurements. Volume calculations require suitable software, a representative surface model and a defined reference surface or base. Some field 

software supports volume calculations onsite, while other workflows use office software. Confirm the features and licences included in your chosen setup.


What affects the reliability of the result?


Survey control, measurement quality, terrain coverage, breaklines, boundaries and the reference surface all influence the result. More points alone do not correct a wrong height 

reference or an unsuitable stockpile base.


Discuss your earthworks survey setup with BinCe


BinCe is a Melbourne-based supplier of surveying equipment for customers across Australia. Our GNSS RTK range includes the RT80 and RT90.


If you are planning terrain mapping, stockpile surveys or earthworks progress checks, tell us about your site conditions, required accuracy and existing software. The BinCe team

 can help you discuss an equipment configuration and confirm software compatibility before purchase.


Explore BinCe GNSS RTK systems or contact BinCe to discuss your next project.